Thursday, March 1, 2007



Dave got the Engine Started Sunday!

After about 2 months of work on the engine overhaul, he put it all back together again, and it still works!! Installed new valves, machined the head, magnafluxed it, and cleaned and painted all the pieces (Perkins Blue!). He also installed rebuilt injectors and injection pump, and replace all the hoses and gaskets ($150 worth!). It is the most beautiful diesel I have ever seen.

On Monday morning, Dave and friends Jim and Jim motored up to Port Canaveral to haul Soggy Paws at Cape Marina. Dave didn't tell our friend Jim the sailor that he'd taken all the sails off the boat (they are stacked in our living room right now). The wind was perfect for a sail up the river, but they had to motor. Jim said "I'm so embarrased to be motoring on the river in a sailboat, with a fair wind".

The haulout is well underway ...
- The prop shaft is out and off to a machine shop (to cut a few inches off the shaft)
- New 2" cockpit drains and seacocks are in process
- New cutlass bearing is underway
- The transmission is out being cleaned and repainted.

Dave has a finite list of things to complete, then a few coats of paint on the bottom and back in the water by late next week.

No comments:

Post a Comment